Serving Leavenworth, KS

CONCRETE & ASPHALT
IN LEAVENWORTH, KS.

Max Paving provides full-service concrete and asphalt work across Leavenworth, KS and the surrounding Kansas City metro. Free proposals, in-house crews, family owned since 2014.

About Our Work In Leavenworth

Local Knowledge.
KC Metro Standards.

Max Paving is the prime contractor on the City of Leavenworth's 2027 CCLIP project on 4th Street, and our crews started the concrete work in October 2026. The city's notice to contractors, Project No. 2025-007, titles that work 4th Street Curb and Sidewalks, Seneca to Cheyenne, and calls for reconstruction of curb and gutter, concrete sidewalk, ADA compliant sidewalk ramps at multiple intersections, and an 8-inch concrete alley. For everyday driveway and sidewalk work in the right-of-way, the city points to its Manual of Infrastructure Standards, which asks for at least 6 inches of concrete where a walk crosses a driveway or meets the street at an access ramp. Curb that gets cut for a new driveway or ramp is replaced between the nearest construction joints, and ramps are built at the maximum allowable grade so water stays in the gutter line. Walks and curbs also call for the city's standard 4K Kansas City Metropolitan Materials Board mix with granite or trap rock aggregate, and the city inspects sidewalk work before anything is placed.

Colonel Henry Leavenworth founded the fort in 1827 on the bluffs of the Missouri River, according to the city's history page, and the Kansas Geological Survey says loess, a wind-blown silt, lies mainly along those bluffs in Leavenworth County in deposits from a few feet to 60 feet thick. A USDA soil query at a downtown point comes back as Knox silt loam, a well drained loess soil of strongly dissected hills and bluffs where the USDA lists slopes anywhere from 2 to 35 percent. Points we checked west and south of downtown come back as Sharpsburg silty clay loam, which the USDA puts at 36 to 42 percent clay in its control section. Census estimates show more than a quarter of the city's housing was built in 1939 or earlier, so plenty of driveways and walks sit on lots laid out generations before the current manual was written. We check the base and the drainage on every job, and on a sloped lot we set the grade so runoff moves past a new slab instead of working its way under it.

On the industrial side, the city's 80-acre Business and Technology Park opened in 2018 near the older business park along Eisenhower Road. In June 2026 the Leavenworth County Development Corporation announced that a Texas-based machinery company had bought a five-acre site in the Gary Carlson Business Center, which the county port authority developed in 1989, for a planned 20,000-square-foot facility. Sites like those need truck lanes and dock aprons that hold up under loaded trucks, and heavy-duty concrete for that work typically runs 8 to 10 inches thick depending on the loads, the ground, and other factors. We do the excavation and base work under that concrete ourselves, drainage included, with our own equipment. The crews on the 4th Street job are the same crews that pour our residential driveways and commercial lots. There is no single minimum job size because it depends on the type of work, and Wendell or Daniel can look at your site and put together a free written proposal.

Leavenworth, KS
Service Coverage Area
  • Commercial parking lots, drives, and flatwork
  • Residential driveways, sidewalks, and patios
  • HOA and multifamily work, scheduled around residents
  • Industrial concrete pads and heavy-duty asphalt
  • Municipal and church maintenance contracts
  • Free onsite proposals, with callbacks the same or next business day
Common Questions

Paving In Leavenworth: FAQs

Who has to fix a broken public sidewalk in front of a Leavenworth property?

Kansas law makes the owner of the abutting property responsible for keeping the sidewalk in repair, and it lets a city make the repair and assess the cost back to that property. Leavenworth also runs a cost-share program for replacing existing sidewalks or building new ones that are not part of a new subdivision or new building construction. Timing matters, because the owner has to ask to participate in writing before any work starts. A building permit and a city inspection come next, and once the work is done the owner submits the bill for reimbursement. The program does not cover brick sidewalks, and the city's share is set in its program guidelines, so we confirm the current figure with Public Works before we write your proposal.

What does Leavenworth require when a driveway approach is replaced?

The city requires a permit for any driveway approach or sidewalk in the public right-of-way, and the application goes to the Inspections Department with a site plan showing property lines and setbacks. Its infrastructure manual calls for at least 6 inches of concrete, with the old approach saw-cut full depth before it comes out and a half-inch pre-molded expansion joint at the cut. Curb cut for the new approach gets replaced between the nearest construction joints, and the work can't block the flow of water in the gutter. On a curbed street the approach can't be wider than 30 feet including wings and flares, or the zoning limit if that is smaller. The new approach also has to be graded so a sidewalk crossing it meets accessibility rules, and the city inspects the work before the pour.

Can a sidewalk repair in Leavenworth turn into a new curb ramp?

It can. The city's infrastructure standards say work on or near a sidewalk and the curb next to it is reason to install a curb ramp if current PROWAG accessibility rules call for one. Repaired walks also have to match the existing width or 4 feet, whichever is greater, with line and grade brought into compliance as far as the site allows. On an older block where the corner sits on a slope, that can change the scope of what started as a small repair. Our estimators check the corner slopes and the route to the street before they put a number on paper.

What does the city require before a commercial lot or truck apron gets dug out in Leavenworth?

The city's infrastructure manual requires 811 utility locates before any digging, and it ties excavations to a Land Disturbance Permit under Section 18-91 of the city code. Jobs that disturb an acre or more also need a notice of intent permit and have to follow KDHE erosion-control guidelines. Any excavation under a paved surface or within 2 feet of one is backfilled with flowable fill, though the City Engineer may approve AB-3 rock compacted in 8-inch lifts. New commercial developments need a drainage plan that meets the city's stormwater guidelines too. On a working lot we phase the pours so part of the site stays open, and a faster-curing mix that costs more can cut the wait before traffic from about 7 days to 2 or 3.

Ready to start your project?

Call (816) 220-7777 Request a Proposal
Get In Touch

Free Proposal For Your Leavenworth Project

Callbacks the same or next business day. In-house crews. Free, detailed proposals.

Call
Mon–Fri, 8:00 AM – 5:00 PM
Email
Office
29803 SW Eagles Parkway
Grain Valley, MO 64029

Request a Free Proposal

Tell us about your project. We'll get back to you the same or next business day. Fields marked with an asterisk (*) are required.

We use your information to respond to your request and prepare your proposal, and we never sell it. Privacy Policy

Or call us directly at (816) 220-7777

Call (816) 220-7777